Assembly of an S-Series Building is easy.

This full-size animation may take 15-30 seconds to load.  Please hold on or scroll down to review the step-by-step instructions.

Step 1
Pour a simple floating concrete perimeter with a channel to receive the arches. (If you will be using a flat foundation, base connectors are recommended.)
Step 2
Assemble arches on the ground. The precision-made arch panels bolt together quickly and easily with only one-size bolt and fastener. Caulking and neoprene washers ensure a weather-tight seal.
Step 3
Slide arches into foundation channels and raise upright. If only assembling and erecting half-arches, use basic supports or scaffolding to hold them in place and speed-up erection process.
Step 4
Arches are raised and progressively joined together. Precision engineering ensures a snug fit. Half-arches can be lapped and bolted together to make a full arch.
Step 5
Seal the arches at their base with concrete for foundations with channels or bolt them to the optional base connectors (for flat foundations).
Step 6
Any number of accessories or components can now be added to finish off your building: endwalls, insulation, man or garage doors, windows, ventilators, and translucent fiberglass panels (skylights). See the Miracle Span Accessories List for more information.

© 2001 Miracle Steel Structures, Inc.